The Department of Public Works and Highways has issued show-cause orders to contractors in Taguig accused of continuing construction at a reclaimed-land site in Lower Bicutan despite an existing cease-and-desist order (CDO), DPWH Secretary Vince Dizon confirmed this week, according to The Philippine Star. The agency has not named the contractors or disclosed potential penalties.
District engineers issued the show-cause orders after reports surfaced that work continued at the Lakeshore Complex site despite the CDO, Star correspondent Rainier Allan Ronda reported. Dizon said he personally had the site checked: "As of our latest reporting, no construction work is continuing at the site. I personally had it checked yesterday and there are no longer workers on the ground," he said. Contractors have yet to submit their formal explanations, after which DPWH says it will determine what penalties, if any, apply.
That leaves basic accountability questions open for now: which companies ignored the order, for how long, and why the violation wasn't caught before public reports forced DPWH's hand. A department that spent much of 2026 under scrutiny for its own contracting practices — in the fallout from the flood-control kickback scandal that has produced plunder charges against a former House Speaker and dozens of Sandiganbayan cases — has an obvious interest in being seen to enforce its own stop-work orders. Whether the Taguig case ends in real penalties, or a quiet resolution once "workers" are no longer visible on-site, is the detail worth tracking once DPWH reviews the contractors' explanations.
The enforcement action came the same week DPWH and watchdog group Bisto Proyekto launched a public transparency portal tracking 11,372 proposed infrastructure projects worth a combined ₱445 billion nationwide, according to the Star's report — part of a broader push, following the flood-control scandal, to let the public see proposed projects before funds are released rather than learning about ghost projects after audits catch them. The portal's premise is straightforward: sunlight before disbursement is cheaper than a Commission on Audit fraud report after the money is gone.
It's a step DPWH watchdogs have called for since the flood-control scandal broke, though its usefulness depends entirely on how complete and current the department keeps the underlying data — a portal listing ₱445 billion in projects is only as good as the follow-through in enforcing it, the kind currently being tested in Taguig.
Context
DPWH has been at the center of the Philippines' flood-control corruption scandal, which by the Ombudsman's own count has produced 35 cases now before the courts and 166 more under investigation, as Pulpulitiko has reported. The agency's 2026 budget release rate for infrastructure projects has run close to full disbursement even as other departments lag, drawing separate scrutiny over whether speed has come at the expense of oversight.
Sources
- "DPWH summons Taguig contractors for CDO violation" — The Philippine Star, Rainier Allan Ronda, Sept. 21, 2026

